3FACE produced the construction drawings for the systems of VI Palazzo in San Donato Milanese and developed coordinated BIM modeling for the various disciplines, including MEP and fire protection, across the three technological plants.
The process involved a detailed examination of individual equipment and their interconnections through coordinated models.
ENI
2018 - 2019
65.000 mq
//